Work tasks stay in work hours
Use your default schedule and custom per-channel schedules to control when each kind of task is projected and auto-scheduled, such as keeping personal tasks out of the workday.
To play videos here, allow cookies in your cookie settings. Or watch this one on Loom.
In this video
How to do it
- Go to Settings > Schedules and set your default schedule's start and end time for each day.
- To change only one day, drag the start or end-of-day line on the calendar instead.
- Add a custom schedule for a context or channel (for example, personal tasks from 5 p.m. on weekdays).
- Click Add to create more than one block in a day, leaving gaps for breaks like lunch.
- Leave a day out of a channel's schedule to keep those tasks from being projected that day.
Transcript
Show the full transcript
Hey, everyone. Hope you're well. Uh, as I may have mentioned in the last video or a recent video, I wanted to also make a video concerning, uh, task projections when it comes to these settings, your schedule settings. And, uh, these settings are found in your settings page under schedule. This is what you'll see. Uh, you'll at least see this top part default schedule. And if you have custom schedules set up per channel, you'll see those down below. If you don't yet, you won't see this, but I'll get into both of these. I wanted to talk about,
um, what they are, how you can use them, uh, and, and, what, what they mean. Uh, schedules, these settings, are your way of telling Tsinsama when and on which days you want tasks to be both projected and auto-scheduled. . . These settings, uh, apply to both projections and auto-scheduling. It's the same thing basically. If you use projections, these settings will determine when tasks are projected. If you auto-schedule your tasks, same thing.
If you use both projections and auto-scheduling, same thing. This is U-telling Tsinsama when tasks should be projected and scheduled. Uh, let's talk about the default schedule first. This is- This is U-telling Tsinsama when the bounds of your typical day are. And you can think of that in whatever way works for you, but I think for most people this will be, uh, your workday. So, what's the earliest you want tasks projected and visualized? And when's the end of your workday? And you can see mine on- on
weekdays I have it set up from eight to four, uh, typically. And if you look at your count- and thunder and Tsinsama, if you have projections turned on, you'll see these little squiggly lines. Uh, there's some at the beginning of day, um, and the end of the day. And those are determined by these hours. So, uh, it might not be coming out through this video because they're pretty faint. But, for example, if I were to change my Friday, start time to 9 a.m. We'll see that this jumped down. And now nothing's projected before that. That's the- beginning of my day. Similarly, if I were to take,
uh, the- the end day, end time and- and change that. May not see it, but it moved, uh, on here to, uh, this'll be a little easier to see there. Um, so, in other words, the default schedule determines the bounds of your typical, uh, day and when your tasks will show up. And you can control, basically, the- We'll see ending and end of your day by controlling these schedule settings. And now, every Friday will look like these hours, every Thursday, like these, et cetera. Uh,
however, not every day is going to go exactly the same, so you can actually make day-by-day adjustments without coming to your settings and adjusting the entire weekly schedule, uh, by just staying in your workspace and playing with these squiggly start and end. And uh, times. So, for example, if, um, uh, Thursday, let's say I had a, uh, uh, I had to end early or something or I wanted to work later, whatever it is. Um, but it was just unique to tomorrow, not every Thursday. Uh,
when I'm planning my day or at any point, I can just pick up this line and move it. And this will not affect these schedule settings. It will only affect the schedule- Good. So, that's a nice way that you can kind of make, uh, adjustments day of, as needed, without adjusting your actual schedule. So, the default schedule, if you have nothing else, if you, if you don't have any settings down here, this will bound all of your tasks. This is when your tasks will be, uh,
projected and auto-scheduled. But if you do have custom- question. Some schedules per channel. Uh, think of the default schedule as sort of the fallback. Unless a task falls under something under this section, it will, uh, defer to, to the default schedule. And you can see that I do have, um, custom schedules set up for my personal context, uh, every day of the week. And I'm hiding my tasks right now, but I'll show you them. If I, Uhm, turn on the, oops. Turn off the filtering.
You'll see that, um, all my blue, uh, tasks pop in here. And I have, uh, my personal schedule on weekdays, uh, not starting until 5 p.m. Um, and this is just Monday through Friday. And I like this technique because this means my personal tasks are not getting projected and mixed in with my work tasks during my- workdays. So, uh, anytime I add a personal task to my task list one of these days, no matter where it is in the task list. So even if I just add, let me add,
uh, add this to the top of my task list, uh, personal task. Even if this goes to the top of my task list, we'll see that it's projected within these hours because it is assigned to that same context. next. And, uh, it will show up later on the calendar. Same if I go to, um, auto-schedule this, it will get pinned at that time. So I like this technique for people are always asking how to separate personal and work. Uh, and since I'm, uh, when it comes to projections, I really like this technique of,
of, uh, if it works for you. Maybe, maybe you want things mixed in, but I like, uh, uhh, uh, you know, having my work time, being my work time, and I'm basically using my default schedule as my work time. Um, and then everything outside of that, uh, can be personal. So I just have my personal hours set up outside of that. And you'll see on the weekend, um, they're much bigger hours, so I'm okay with, with, uh, personal tasks being projected on, on the weekends. Um, but, On weekdays,
they don't project until the evening, so they're not gonna mess up my, um, work task projections. Uh, so that's, that's a, that's a workflow for your personal tasks, but what about, this is more, maybe useful, uh, what about the types of work tasks that you want to do at certain times of certain days? Um, that's a perfect example of where you would set up another custom schedule. schedules. So let's say that I want to work on, um, my newsletter work only on certain days or certain times,
so I'm gonna create a custom channels for, uh, a custom schedule for my growth channel, which is what I assign my, uh, newsletter-related tasks to, like this pro tips task I'm working on, newsletter, stuff like that. And, as soon as I create a custom schedule for that, it, it creates- um, for all the days, and then I can go ahead and, um, sort of adjust these, uh, on a, on a day-by-day basis. So, for example, let's look at Thursday again. Um, Thursday I have, uh, a newsletter task,
it's projected at 8 a.m., but let's say that, for whatever reason, maybe it's the ebbs and flows of my- my focus and my energy, or maybe it has to do with real scheduling things like meetings. meetings. Let's say that I only want to work on this type of work in the afternoon on Thursdays. Um what I could do is change these scheduling hours. I could say I only want to work on this from noon to, er, uhm, three. And we'll see that, uh, it- it- it moved on the schedule there- because it doesn't
fall back to the default schedule, it's assigned to this channel, and- If and it will defer to that. I can even create multiple little scheduling blocks. Think of these, like, invisible time slots, right? Where, um, this is where these tasks are going to be projected and auto-scheduled. I could add- click add, and then add another block. You know, I could do something like before lunch and after lunch, that sort of thing. Um, and, uh, if you omit a day like I have here Saturday, day. That could be nice because then if you added,
uh, if you had a work task on a weekend, but you didn't have a work schedule there, let me just add newsletter here. I won't see it projected. Um, and that could be nice just for sort of a visual piece of mine, not seeing my work tasks on the weekends. Even though they're on the task list there, I'm not going to see it clutter my- my calendar if I look at it since I'm- as I'm working on personal things, uh, during the weekend. So, um, I-I-I tried to touch on a lot of things here and maybe
I didn't get as in-depth as- as I wanted to here. You know, what I'm going to do is just make another little, uh, another, Let's do this. Oops. Another newsletter task. Uhh, newsletter review on Thursday. And, um, I'll make this 45 minutes. What do we have here noon to? So, let's say that, uh, you know, I wanted to have lunch at 1,
and then I wanted to get back to newsletter work. We would see, um, something like this where, The schedule on Thursday is such that these tasks will be scheduled or projected just during these blocks, and I could kind of create breaks by creating multiple scheduling blocks on a certain day. So between 1 and 2, I know there's not gonna be any growth tasks projected during that time, if that makes sense. Sorry, that was sort of an impromptu demo.
I could've set that up a little better, but I think you know what I mean here. So hopefully this explains, um, how schedules work, how can, how you can use them. Um, thinking of your default schedule is the fallback and then sort of getting more granular from there. Uh, whether it's context, like I have for my entire personal context. So if I had other tasks assigned to not just the context, but a channel within the context, it would fall. All under this schedule, um, or individual, uh, channels within a context,
like this one in my work context, this growth channel will only be projected during these times. Um, hopefully that's a nice, uh, nice tool to have in your pocket when it comes to planning your day, planning your week. Um, thank you so much for watching. Reach out if you have any questions. I know there's a lot going on here. Thank you.
Questions
How do I keep personal tasks from showing up during my workday in Sunsama?
Create a custom schedule for your personal context in Settings > Schedules that starts after work hours on weekdays. Personal tasks are then projected and auto-scheduled only in those hours.
Does dragging the end-of-day line change my schedule settings?
No. Dragging the start or end-of-day line on the calendar adjusts that day only; your weekly schedule stays the same.
What's the difference between the default schedule and custom schedules?
The default schedule is the fallback for every task. Tasks in a context or channel with its own custom schedule follow that schedule instead.